2-4.5. Preliminary Pole Installation Instructions
Perform the following preliminary instructions (see Figure 2-7):
N
N
O
O
T
T
E
E
Perform a site survey of the station prior to
installation. For further information, contact Orpak
Technical Support.
1. Obtain an installation plan, designed by an authorized engineer, and applicable to all
authorities having jurisdiction
2. Ensure that this plan design reflects the existing electric infrastructure of the site
3. Run cable conduits for power and communication cables to the spot for the installation of
the pole of the single Secured OrPT Single Box
4. Prepare Installation Plate with four ICU bolts attached with M10 nuts. Check that the bolts
protrude from the plate by 35 mm
5. Dig a hole on the ground of:
Width x Length x Depth – 300 x 300 x 400 mm
6. Insert Installation Plate in the hole
7. Take care that the power and communication cable conduits pass through the central hole in
the Installation Plate
8. Pour concrete type B200 in the hole as a support base for the pole