Easy DIY Eco-Friendly 3D Dimensional 3D Wall Board Installation Instruction Light Weight
Installation Instruction Ⅱ Installation Steps 1. Measure the wall and plan the design. 1) Measure and mark horizontally and vertically the area of installation 2) Select a pattern for installation. Arrange it on the floor by rotating the panels before attempting to install ensuring correct installation of the desired pattern. 3) If the area for installation is not square, or just meet the connection of the circuit, the panels can be cutted by knife 2.
Installation Instruction 3 Priming 1) Painting the surface with water-based primer in order to sealing the surface and maintain the boards dry, so that expansion and contract can be reduced. It will be better if painted twice 2) It will take at least two hours to dry, and the time will be a little longer in Winter and wet seasons. 4 Fill the gaps 1)Fill the gaps with acrylic emulsion caulking along 2)It usually takes two hours to ensure the caulking dry in one direction.