Installation Instruction
Ⅱ Installation Steps
1. Measure the wall and plan the design.
2. Adhere with All-purpose adhesive glue (
Titebond made in USA recommended)
5) Use the wallpaper (knife) or sandpaper to
clean the gaps to ensure all the gaps are smooth
and neat
1) Measure and mark horizontally and vertically the area
of installation
2) Select a pattern for installation. Arrange it on the floor
by rotating the panels before attempting to install
ensuring correct installation of the desired pattern.
3) If the area for installation is not square, or just meet
the connection of the circuit, the panels can be cutted by
knife
1) Use the all-purpose adhesive glue to dot on
the board every 30 to 50 mms on the flat surface,
Especially on the edges of the boards, the point
of the glue must be 5mm inside against the edge
in order to avoid the glue overfolw.
2) After dot the glue on the
b
oards, put it on the wall
and take it out asap. This method is only used for the
glue (Titebond). For other kinds or brand of glue,
please follow the instruction indicated in the glue
packaging
3) Keep gaps of 1.5mm between different boards
for future adjustment if there is distortion of
boards caused by room humidity. It’s better to use
the tile cross
4) Press the panel to ensure all its corners and edges
adjoin the surface, avoid strong pressure on the relif
parts.It will be better set aside one hour for drying,
then move to the next step.
Installation Instruction