Owner Manual

2
ROUGHING-IN
55"
29 1/8"
19 5/8"
25 1/4"
31 1/2"
21 5/8"
41 3/4"
71"
17 3/4"
71"
Hydromassage
Pump
Electrical
Power Outlet
Air Blower
14 1/2"
Water depth
BEFORE YOU BEGIN
PRODUCT REQUIREMENTS
A. Summary Of Key Requirements
Observe all local plumbing codes, Install the unit to a level suboor,Provide properly
-dimensioned framing.
B. Product Inspection
Uncrate and inspect bath for damage. Leave all materials in the crate during construcon to
prevent damage.
Please read these instrucons carefully to familiarize yourself with the required
tools, materials, and installa
on sequences. Follow the secons that pertain to
your parcular installaon. This will help you avoid costly mistakes. In addion to
proper installaon, read all operang and safety instrucons.
All informaon is based on the latest product informaon available at the me of
publicaon. We reserve the right to make changes in product characteriscs,
packaging, or availability at any me without noce.
32 1/4"
17 1/4"
24"
67"
44"
14 1/4"
31 1/2"
21 5/8"
Electrical Power OutletAir Blower
14 1/8"
Water depth
22 7/8"
16 7/8"
66 1/2"
41 3/4"
31 7/8"
20 1/2"
Hydromassage
Pump
Electrical
Power Outlet
Air Blower
IMPORTANT INFORMATION
Measurements are ± 1/2" and subject to change without noce
Specicaons & Conguraons are subject to change without noce
Please measure tub on-site before installaon
Please note that installer(s) must be cered or warranty will be voided.
Measurements herein supersede all others published prior to purblicaon
date shown below
Before ordering or installing, please consider future access to equipment