Owner Manual

3
INSTALL BATHTUB
1) Your new bathtub has been manufactured to the highest possible standards,it has been tested
and approved by factory
INSTALLATION REQUIREMENTS
A. Tools Required
Adjustable pipe
wrench
Ruler
Level
Safety shoes
Safety glasses
Square
Screwdriver
Pliers
Ulity knife
B. Materials Required:
Plumbers puy
Wall coverings, as necessary
Silicone sealant
Gypsum cement (oponal)
Construcon adhesive
(oponal)
Protecve covering for
bathtub
Nails
C. Clearance Requirements:
Check the rough-in and room dimensions to provide adequate space for the bath unit.
SITE REQUIREMENTS
A. Plumbing Preparation
Posion the plumbing according to rough-in dimensions.
Cap the supplies and check for leaks.
BEFORE INSTALLING UNIT
CAUTION: Ensure a watertight seal on the bath drain connections.
A. Install the faucet valving and shower head tee.When drilling bathtub for faucet,
ensure sucient clearance. Open the hot and cold water valves and check the
supply connecons for leaks.
B. Run water into the bath and check the drain connecons for leaks.
C. Fill the bathtub up to the overow level and check overow unit for leaks.
This products must be installed by a fully insured and licensed plumber only.
2)
When removing bathtub from protecve carton. DO NOT LIFT BATHTUB BY PIPE WORK.
Inspect for any possible damage that may have occurred in transit.
IMPORTANT: Bathtub must be installed level on all top edges.