Owner Manual
3
INSTALL BATHTUB
1) Your new bathtub has been manufactured to the highest possible standards,it has been tested
and approved by factory
INSTALLATION REQUIREMENTS
A. Tools Required
• Adjustable pipe
• wrench
• Ruler
• Level
• Safety shoes
• Safety glasses
• Square
• Screwdriver
• Pliers
• Ulity knife
B. Materials Required:
• Plumbers puy
• Wall coverings, as necessary
• Silicone sealant
• Gypsum cement (oponal)
• Construcon adhesive
• (oponal)
• Protecve covering for
• bathtub
• Nails
C. Clearance Requirements:
Check the rough-in and room dimensions to provide adequate space for the bath unit.
SITE REQUIREMENTS
A. Plumbing Preparation
Posion the plumbing according to rough-in dimensions.
Cap the supplies and check for leaks.
BEFORE INSTALLING UNIT
CAUTION: Ensure a watertight seal on the bath drain connections.
A. Install the faucet valving and shower head tee.When drilling bathtub for faucet,
ensure sufficient clearance. Open the hot and cold water valves and check the
supply connecons for leaks.
B. Run water into the bath and check the drain connecons for leaks.
C. Fill the bathtub up to the overflow level and check overflow unit for leaks.
This products must be installed by a fully insured and licensed plumber only.
2)
When removing bathtub from protecve carton. DO NOT LIFT BATHTUB BY PIPE WORK.
Inspect for any possible damage that may have occurred in transit.
IMPORTANT: Bathtub must be installed level on all top edges.