User's Manual

14
2. Hardware Installation
2.1 The Hardware
2. 2 Installation
2.2.1 Installing the Base Station
Connect the Base Radio Transceiver and the AMU as illustrated in Sections 2.2.1.1 and 2.2.1.2.
Power up the AMU, the front panel power LED indicator should be RED, indicating “power on self test”
(POST) is in progress. After successful POST, the LED will turn to GREEN, indicating the unit is ready.
Next, power on the Base Radio Transceiver, the LED indicators on the front panel of the transceiver
should exhibit the following blinking patterns:
LED Color Light Blinking Pattern
ON RED Steady on
RX GREEN Steady on
TX RED On, when transmitting
LINK / NW YELLOW On/off slow blinking
If the yellow LED is showing a one long, one short blinking pattern, it indicates that the 10BaseT port on
the Radio Transceiver is not properly connected. Check your UTP cable connection between the
transceiver and the Access Management Unit (AMU) and make sure that the right cable is used.
When any one of the Client Station Transceiver served by the Base Station Transceiver is powered on
and the RF link is successfully established, the yellow LED on the Base Radio Transceiver will change to
a continuous flickering pattern.
2.2.1.1 Installing the Base Station when Single Base Radio Transceiver is used
2411EZYLINK-E-BST-TRX
2411EZYLINK-E-BST-AMU
RJ-45 10 Base T
Connector
To Ethernet
Network
RJ-45 10 Base T
Connector
RF Connector
RF Cable
To Antenna
Cross-over UTP Cable
for connecting to PC
Straight-through UTP cable
for connecting to Hub Switch or Router
Straight-through
UTP Cable
Base Radio Transceiver
Access Management Unit
Port A
Port B