OutBack Power SkyBox Quick Start Guide

L1
L2
NEU
GROUND
AC Subpanel
Loads
L1
L2
NEU
GROUND
Utility
Grid
AC Distribution Panel
N
AC Generator
Generator
Start
L1 L2
L1 L2 N
Photovoltaic
(PV) Array
Neutral
HOT L1
Ground
AC LEGEND
N
L1
HOT L2
L2
RTS
BMS
Wiring
and : Connect ground wires for battery, AC, PV, and additional PV equipment.
: Connect to SkyBox negative (–) , then connect to battery negative (–).
and : Connect PV array negative (–) and positive (+) wires.
Use terminals and
for a second array, if present.
: Connect all AC neutral wires.
: Connect SkyBox ground wire to in BOS.
: Ensu
re the rapid shutdown jumper or device is installed into A
UX terminals. Remove the
factory jumper before installing an external device. Route the wires through channel .
: Connect AFCI cable assembly to SkyBox socket .
and : Connect to the matching sockets in the wiring compartment.
: Connect SkyBox PV negative (–) wire to . Do not remove the jumper cap.
NOTE: is placed on the opposite side of the switch from and .
: Connect SkyBox PV positive (+) wire to . Ensure that all four screws at this location are tight.
: Connect to battery positive (+).
: Connect to SkyBox positive (+) .
and : Connect to load subpanel L1 and L2 respectively.
and : Connect to utility grid L1 and L2 respectively.
and : Connect to generator L1 and L2 respectively.
: If current transducers (CTs) are in use, they are installed at the main AC panel.
Route the L1 and L2 wires through channel and install into A
UX terminals.
(White wires use terminals 10 and 11; black wires use terminals 2 and 3.)
NOTE: A CT is labeled as oriented toward the “source”. “Source” is defined as
the SkyBox, NOT the utility grid. (A separate labeled arrow shows the location
of the utility grid.) Orient each CT accordingly for correct current readings.
: Connect internet or router cable to W
ALL port . Route through channel .
NOTE: Do not connect this cable to the other ports on the display.
: For batteries with a separate battery management system (BMS):
The BMS (CAN bus) adapter cable converts the RJ45 cable end to RJ11.
It connects to the BAT MON port . Do not insert the RTS or any other
RJ11 cable into the BAT MON port.
: If a BMS is not present: Connect the remote temperature sensor
(RTS). Attach it on a battery sidewall near the center of the bank.
: Connect generator start wires into A
UX terminals . (See the
key to the right.) Route through channel .
: To connect multiple SkyBoxes in parallel, connect the master to
the W
ALL on the next (slave) unit. The last SkyBox in
sequence has nothing in port . This marks it as the end unit.
(See the Commissioning section of this sheet and the NETWORK
tab in the SkyBox Programming Guide for additional steps.)
1a
NOTES
 Make connections in the order indicated. If steps or connections are not applicable, they can be skipped.
 Tighten the applicable connections to the torque values specified in Table 1. (See opposite sheet.)
 Do not connect the PV positive (+) or negative (–) conductors to ground.
 Perform all wiring in accordance with Article 690 of the National Electric Code.
Negative
Positive
Ground
DC LEGEND
7a
7b
6
3c 4c 5c
7c
7d
9 9a
2a
2b 2c
5a 5b
3a 3b
4a 4b
14
16
18
13
13
7d
12
19
15
12
17
16
1b
7a 7b
13
18
2a
1a
3a
3b
4a
4b
5a
5b
6
7a
11
17
9
2c
1b
2b
3c 4c 5c
14
15
9a
8a
7b 8b
Circuit #1
Circuit #2
CT (L1)
Internet
Rapid
Shutdown
Initiator
Gen Start (AUX)
COMMUNICATIONS LEGEND
Rapid ShutdownRJ45
RTS
AFCI
CT
BMS
Next SkyBox
PV Cable
12
13
17
Current transducer connections on L1 and L2 AC inputs.
NOTE: Only L1 is shown in the wiring image, but both
must be connected. 10 and 11 are for hot wires; 2 and
3 are ground. See the SkyBox Programming Guide.
Rapid shutdown inputs (4 and 12).
These terminals connect to normally-
closed dry contact terminals on the
RSI (Rapid Shutdown Initiator). Use
OutBack’s ICS Plus or an equivalent
RSI system. See the RSI literature
and the SkyBox Overview Guide
(Troubleshooting section) for
instructions if rapid shutdown occurs.
Rapid shutdown outputs
(5 and 13). These are used to
duplicate the RSD connection
and function for an additional
SkyBox. They should be wired
to terminals 4 and 12 on the
next SkyBox.
Auxiliary (AUX) dry contacts (7 and 15) or 12-volt
contacts (8 and 16, up to 0.6 Adc) can serve as a
switch for Advanced Generator Start. (See the
SkyBox Programming Guide.)
Unused 1
XCT L2 GND 2
XCT L1 GND 3
RSD
INPUT 1 4
RSD
OUTPUT 1 5
Unused 6
A
UX RELAY 1 7
A
UX 12V GND 8
9 Unused
10 XCT L2
HIGH
11 XCT L1 HIGH
12 RSD INPUT 2
13 RSD
OUTPUT 2
14 Unused
15 A
UX RELAY 2
16 A
UX 12V
NOTES:
 To install a wire, simply push it firmly
into the appropriate hole.
 To remove a wire, push on the release
next to it (the orange area) with a tool.
 Wire may be installed more easily by
pushing on the release with a tool while
inserting the wire.
 The entire terminal block can be unplugged
from the SkyBox to make this task easier.
Hole Release
IMPORTANT
 The SkyBox will not function unless the jumper or device is installed on the Aux terminals . It will show
a Rapid Shutdown fault.
 The SkyBox will not function unless the AFCI cable is connected. This must be done even if the surrounding PV
connections are not used. The screen will indicate an arc fault if not installed.
19 12
Battery Bank
z
NOTE: Ensure the neutral and ground
conductors are mechanically bonded
at one point in the installation. DO NOT
establish more than one bond.
900-0195-01-00 REV B