Outback FXR/VFXR Renewable Series Installation Manual
Installation
32 900-0166-01-00 Rev B
The second inverter must be programmed as
L2 Phase Master
. It must be connected to port 7.
All overcurrent devices must be sized for 60 Aac or less. All wiring must be sized for 60 Aac or more.
All output circuit breakers must be sized appropriately for loads and inverter power.
The AC input (generator or utility grid) must be a split-phase source of the proper voltage and frequency.
When wiring the AC source to the inverters, local codes may require the inverter circuit breakers to be
located at the bottom of the main panel. This prevents overloading of the AC bus.
NOTE
: The FW-X240 and similar transformers are not used for load balancing of stacked FXR inverters.
Figure 24 Series Wiring (Two Inverters)
CAT5 Cables
AC Source
(Utility Grid or AC Generator)
AC Conduit Box
Neutral
TBB
GND
Hot L1
TBB
MATE3
Inverter
AC
Neutral
IN
AC
Hot IN
(L1)
HUB/
MATE
Input
Circuit
Breaker
AC
Neutral
OUT
AC
Hot OUT
(L1)
GND
Output
Circuit
Breakers
Bypass
Circuit
Breakers
Mechanical
Interloc
k
Neutral
TBB
GND
Hot L1
TBB
AC Loads
Ground TBB
(may be within AC
Conduit Box)
Primary
System
Ground
LEGEND
Ground
Hot L1
Neutral
TBB = Terminal Bus Bar
HUB 10.3
10 9 8 7 6 5 4 3 2 1 MATE
Hot L2
TBB
Input
Circuit
Breaker
AC
Neutral
IN
AC
Hot IN
(L2)
HUB/
MATE
L1 Master
L2 Subphase
Master
Inverter
AC
Neutral
OUT
AC
Hot OUT
(L2)
GND
Hot L2
TBB
Hot L2
NOTES:
1. Neutral (common) conductor may
be connected from only one inverter
neutral terminal to a common bus
bar in the AC conduit box.
2. Colors shown here may be different
from wiring standards.