Replacement Part List

6. Carefully slide C-Girder up into notch of
B-Girders. Be careful not to twist the Girder
when pushing up into place. Lag Screw
with Washers (2) the C-Girder to Post when
both pieces are flush with each other.
Lag Screw with
Washers to Post.
7. Lift, position and Lag
screw the opposite
C-Girder to Posts.
8. On level ground, position 1 Joist (D) and
10 Stub Joists (E).
Joists are pre-marked for Stub Joist and Blocking
position.
Girder (B)
C-Girder
Girder (C)
E
D
Pre-marked for Stub
Joist placement
Notches facing down
9. With Stub Joists positioned correctly on Joist,
attach with 2 - 2 1/2” screws. Stub Joists should
be flush with top and bottom of Joist with all
notches facing down.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 6