Warranty

7.Attach Floor Runners to completed floor frame.
There are 2 floor runners per 136 1/2” side and 5
completed runners in total. Use 6 - 2.5” screws per
Runner.
96”
5. Complete all large and small frame attachments.
Screw each completed section together with 8 - 2.5”
screws.
6. When completed, your floor footprint
should be 136 1/2” wide x 96” deep.
136 1/2”
8. Make sure Runners are flush with outside
and front and rear floor framing but not
overhanging.
3. Lay out Floor Joist Frames as
illustrated. There are 3 larger and 3 smaller Frame
Sections. The Footprint for the floor when attached
together will be 136 1/2” wide x 96” deep.
4. Attach each large and small floor
joist frame together with 6 - 2.5” screws
per section.
Front of Shed
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 5
You can find the
Square Drive Bit for
the screws in with the
Hardware Kit Bag.