Warranty

Note: The floor will be flipped over
and the floor runners will sit on your
foundation. It is important to note, that
having a level foundation is critical.
Choosing a foundation will vary between
regions. Typical foundations can be
concrete pads or patio stones positioned
underneath the floor runners.
10. With Floor Runners attached, carefully flip
the floor over and place on your foundation.
Caution: you will need 2 people to assist you.
Be careful when laying floor down not to bend or
twist floor. When in place, level floor completely.
Concrete Slab
Foundation
Foundations
9. Complete remaining Floor Runners.
11. Position Plywood Floor pieces (6) on top
of completed floor joists. Plywood will sit flush
with outside of floor joist frame.
Hint: Use a chalk
line to mark location
of floor joists to
determine screw
placement.
Front
12. With Plywood positioned correctly on floor
framing, attach with 1 1/4” screws. Use screws
every 16”.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 6