Warranty

Do Not Attach Walls To
Floor Until Step 26
17. Position side solid wall into place on
plywood floor. Butt both vertical wall studs
of side and rear walls together and attach
with 3 - 2.5” screws. Screw at the bottom,
middle and top of stud to secure properly.
Side Wall Panels
Side Solid Wall
Rear Solid Wall
18. With the corner wall
attachment complete, position
a second side wall panel in
place so bottom 2x3 wall
framing is sitting flush with
outside floor joists and
plywood floor. Wall siding
should overhang floor by
approximately 1/2”. When
positioned correctly, attach
both side wall panel studs
together as per Step 17.
Side Solid Wall
2x3 wall framing flush
with outside of plywood.
Be sure that
rear wall panels
fit between the
side wall panels
(sandwiched).
Rear Wall Panel
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 9
Optional - Caulking
seams will help prevent
moisture from entering
at seam. Caulking not
included in kit.