Instructions / Assembly

27. Complete both Post and Rail
sections and lay out on a level surface.
Attach the Porch Post Top Connector
with 2 - 2” screws per post. Drill pilot
holes to prevent splitting.
Porch Post Top
Connector 89” long
Side Rail
2.5” screws
Completed Front Porch
Rail Section.
28. Carefully lift and
position completed Porch
Rail Section on
plywood floor near front
edge.
29. Place Side Porch Rail Section between Wide Trim on Playhouse and
Porch Post. Align rail 3 1/2” from bottom and secure to wall and post with
4 - 2 1/2” screws. Complete both sides. Angle screw Porch Rail Section to
Plywood Floor with 2- 2 1/2” screws per post. Screw from inside face to
conceal screws. Drill 1/8” pilot holes to prevent posts from splitting.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Rail
aligned
3 1/2” from
bottom of
post.
Post
Top Connector dimension is
3/4” x 2 1/2” x 89”.
Front
Low Side
High
Side
Use Rail Support Block
to determine height of
Rail. See Step 68.
Page 13