Installation Guide

108”
89”
Short Runner
Long Runner
Short Runner
Flush with Floor Framing
Centered
NOTE: The floor will be flipped
over and the Floor Runners will
sit on your foundation. It is
important to note that having a
level foundation is critical.
Choosing a foundation will vary
between regions. Typical
foundations can be concrete
pads or patio stones positioned
underneath the floor runners.
Foundations
3. Attach Floor Runners to completed Floor Frame.
There are two Floor Runners per 108” side and three
completed runners in total. Use 4 - 2.5” screws/runner.
4. With Floor Runners attached, carefully flip the floor over and place on
your foundation. CAUTION: You will need two people to assist you. Be
careful not to bend or twist the floor when laying floor down. When in
place, level floor completely.
2. Lay out Floor Joist Frames. Attach the Floor
Joist Frames together with 2.5” screws. Use 8
screws per section to properly secure frames
together. When completed, your Floor Joist section
should be 89” wide x 108” deep.
Front
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 4
16”
16”
16”
1. Attach Interior Floor Joists to 48” Wide Floor
Joist Frames. Measure and attach both Joists with
2 - 2 1/2” screws per joist end as illustrated to the right.
Outside Frame
to center of Joist
Outside Frame
to center of Joist
You can find the
Square Drive Bit for
the screws in with
the Hardware Kit
Bag.
A. Floor Section