Instructions / Assembly

Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 16
37. Attach end of a 45 1/2” long Soffit Board flush to ends of outside
rafter with 2 - 1 1/4” screws per rafter end. Drill pilot hole in Soffit ends
to prevent splitting. Attach Ridge Board to opposite rafter end aligning
to bottom of rafter with 2 - 2” screws. Center Soffit on Doubled-up Rafters
and secure with 2 - 2” screws. Measure 45 1/2”from outside rafter and
secure Ridge Board to rafter with 2 - 2” screws. Attach Doubled-up Rafters
together with 3 - 2 1/2” screws.
Ridge Board
Important: Ridge
Board must be aligned
as illustrated.
36. Locate 6 - 1 1/2” x 3 1/2” x 56 1/2”
long Rafters, 2 - 1/2” x 4 1/2” x 45 1/2”
long Soffits and completed Ridge Board
from Step 35. Lay out as illustrated on a
flat level surface.
Ridge Board
4 1/2” wide
Soffits
56 1/2” Rafters
20 1/2”
23 1/2”
20 1/2”
91”
Centered on
Rafter
45 1/2”
Attach Doubled-up Rafters
with 2 1/2” screws
Soffit
45 1/2”
38. Measure, position and attach mid rafters as illustrated above as per Step 36.
mid rafter
Important: Pilot
Hole Ridge Board
to prevent splitting!
Important: Pilot
Hole Soffit to
prevent splitting!