Use and Care Manual

Hint: Use a chalk
line to mark location
of floor joists to
determine screw
placement.
12 . With Plywood
positioned correctly on
floor framing, attach
with 1 1/4” screws. Use
screws every 16”.
B. Wall Section
Exploded view of all parts necessary to
complete the Wall Section. Identify all
parts prior to starting.
Window Wall
Panel (1)
Side Top Plates
(2 per side)
Angle cut on edge
Front and Rear Top
Plates (3 per side)
2 Angle cut on 1 end and 1
square cut.
Gable Walls (4)
Door Jamb
Narrow Wall Panel
(12” wide)
Solid Wall
Panel (6)
Door Header
Bottom Wall Plate
13. Starting with Solid Wall Panels, carefully lay panel face down. Position and attach Wall Plate
to bottom of wall studs of each wall panel with 3 - 2 1/2” screws. Position so plates are flush with
framing. Note: some Bottom Wall Plates may already be attached to some Solid Walls.
Window Insert (1)
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 7