Warranty

27. When all walls are attached together,
check alignment with the floor. Bottom wall
framing should sit flush with outside of floor
joists. Confirm 32” wide door opening at
bottom. When positioned correctly, fasten
bottom wall plates to floor using 4 - 2 1/2”
screws per wall panel.
Bottom Wall
Framing
28. Position Front Top Plates on top of
wall studs so they are flush on the inside
with 2x3 wall framing. There are 3 pieces
of Front Top Plates (2 angle cut on one
end and one straight cut on both ends).
Together, the plates should be centered
evenly on the wall left to right. Attach by
screwing down into top wall framing with
4 - 2” screws.
Angle cut on ends.
Top Plates should be flush
with inside of wall framing.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 12
Doorway Opening is 32”
Caulking
Optional: Caulking
seams will help
prevent moisture
from entering at
seam. Caulking
not included in kit.
Angle
screws into perimeter
Floor Joists.