Warranty

48. Place Roof Panel so it sits flush on 3rd rafter from the outside (doubled up rafter). Plywood on
roof should be flush with end of rafter at bottom. From the outside, screw down through bottom row of
shingles into rafter with 1 - 2 1/2” screw. Angle a 2 1/2” screw from outside rafter into roof plywood.
49. Locate Right Front Roof Panel (roof plywood flush with shingles on inside, shingles
overhanging plywood on outside) and place on rafters. Align panels as per Step 48 and screw panel
down to rafter with 1 - 2 1/2” screw in the bottom row of shingles. Angle a 2 1/2” screw from outside
rafter into roof plywood.
50. Position and attach Left Side Roof Panels as per Steps 47-49.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 20
1 - 2 1/2” Screw
1 - 2 1/2” Screw in
Bottom Row of Shingles
Angle Screw from
Rafter into Plywood.
Roof Plywood flush
with rafter end.