Use and Care Manual

Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 21
50. Place First Roof Ridge Cap on roof peak (Undercourse Cap) overhanging shingles by
approximately 1”. Attach with 2 - 1 1/4” Shingle Nails. Place 2nd Ridge Cap 1” back from 1st cap.
51. Attach 2nd Ridge Cap 9” from Ridge Cap end with 2 - 1 1/4” Shingle nails. Place 3rd Ridge Cap
8” back from 2nd (enough to cover shingle nails). Attach 3rd Ridge Cap 9” from end as per previous
Ridge Cap.
9” from end
8”
8”
Undercourse
Ridge Cap
1 1/4” Shingle Nails
9”
52. Position and attach 4th Ridge Cap as described above. Continue to position and attach Ridge
Caps until half of roof is complete. Starting from opposite end, continue to position and atttach Ridge
Caps as per Steps 50-51.
Opposite end
Important: Butt (thick) end
of Ridge Cap will be facing
towards the outside of shed.