Use and Care Manual

12. Starting at the left rear corner, move the Left Gable Side Window Wall Panel into place on floor.
Proper wall positioning is important. From the rear, make sure wall framing sits flush on the floor.
NOTE: Do Not Screw Wall Panel to Floor At This Stage.
View from back of Playhouse
Front
Wall Plate flush
with floor
2x3 Wall
Plate
Siding
overhangs
by 1/2”
Left
Gable
Side Wall
Panel
13. Position first Solid Backwall Panel in the corner next to Left Gable Sidewall Panel.
14. Align the Solid Backwall Panel Bottom Wall
Plate flush with the floor. When positioned correctly,
screw both panels together with 3 - 2 1/2” screws into
vertical studs at the bottom, middle and top locations.
Backwall
Panel
Siding
overhangs
floor by 1/2”
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 8