Warranty

21. Attach the Door Jamb to Right Side Gable Window Wall Panel stud. Make sure Door Jamb is
flush with floor and flush with wall stud. Use 3 - 2 1/2” screws to secure. Next, attach the Door Header
to Door Jamb and Top Plate of Narrow Wall. Use 4 - 2 1/2” screws to secure.
22. Before fastening walls
to floor, check wall alignment.
Once again, the 2x3
bottom wall framing should sit
flush on outside of floor with
wall siding overhanging by
1/2”. When positioned
correctly, attach walls to floor
with 4 - 2 1/2” screws per
panel. Screw from bottom
wall framing into floor.
IMPORTANT: Check door
opening measurement at top
and bottom. It should be
23 1/2”.
Door
Jamb
Door
Header
23. Locate and attach Plywood Ridge Beam Supports to gable peaks with 2 - 1 1/4” screws. Place
Roof Ridge Beam between gables into Ridge Beam Support pocket.
Do not extend
past gable
framing
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 11
Angle
screws into perimeter
Floor Joists.