Use and Care Manual

Outside
Panel
Middle
Panel
Outside
Panel
53. Make sure to attach Roof Panels
down to Rafters as shown above.
52. Position and attach all Roof
Panels as per Steps 48-51.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 22
54. Roof Filler Shingles are included to
cover roof seams. Starting at the
bottom, slide the first Long Shingle in until
flush with other bottom shingles. See
diagram step 55 for proper attachment.
55. Screw first filler shingle down to
rafters using 1 - 2 1/2” screw per panel
(2 in total). Make sure to screw into both
rafters.
Attach above
the exposure
line.
56. Slide in another filler shingle and attach as per Step 55. On your last row of shingles, the filler
shingle is precut to fit properly. Attach to roof with 2 - 1 1/4” Shingle nails per shingle. Position
Simpson Strong ties on plywood and outside rafters and secure with 4 - 1 1/2” screws. There are 4 ties
per gable.
4 - 90 degree Simpson
Ties / Gable.
Exposure
Line