Instructions / Assembly

51. With both Rafter Ridge Boards connected, completely secure Rafters to Gable framing of both
rear and middle Gable Walls. Use 8 - 2” screws per gable.
50. At the peak, align Ridge Boards so they are flush together and secure them with 12 - 1 1/4”
screws. Important: if there is a gap between Ridge Boards, try pushing side walls closer together
from outside. Walls should be 91” apart at top from inside of wall plate to wall plate. To completely
secure Ridge Boards, place 4 - 1 1/4” screws into any of the remaining Metal Ridge Board Connector
holes. Complete both sides.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 21
Offsetting Metal
Ridge Board
Connectors
Important: Make sure Metal Ridge
Board Connectors are offset to one
another as illustrated to the left.
8 additional 2” screws to
completely secure gable to
walls.
Important: - If Gable
framing does not line up
with Rafters, remove
temporary 2” screws from
gable framing. Re-align
gable and secure with
8 - 2” screws total.