Instructions / Assembly

Exposure Line
64. Roof Filler Shingles are included
to cover roof seams. Starting at the
bottom, slide the first Long Filler Shingle
in until flush with other bottom shingles.
See next step for proper attachment.
62. Lift up, position and attach right side Middle Roof Panel on Rafters as per Step 58-59.
63. Lift up, position and attach right side Front Roof Panel on Rafters as per Step 60.
Roof plywood
flush with end
of rafter.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 25
65. Screw first filler shingle down to
rafters using 1 - 2 1/2” screw per panel
(2 in total). Make sure to screw into
both rafters.
Attach above the
exposure line.