Instructions / Assembly

10. Position Plywood Floor pieces (4) on top of completed
floor joists. Plywood will sit slightly back from outside edge of
Floor Joist Framing.
Hint: Use a chalk line
to mark location of floor
joists to determine
screw placement.
12. Attach 17 pieces of 1” x 5 1/2” x 45” Deck Boards using
4 - 2 ” screws per piece. Attach both outside pieces first and
equally space all others on the floor before attaching.
Completed Floor
Important: Make sure floor is level before
moving on to wall section. Use a level to
confirm and shim floor joists as required.
Front
11. When in correct position, attach with 1 1/4” screws. Use
screws every 16”. The Plywood is cut slightly smaller than floor
framing. Keep plywood seams tight.
Lay all Deck Boards down evenly
spaced prior to attaching.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 6
plywood
pushed together
at seam.
9. With Floor Runners
attached, carefully flip
the floor over and place
on your foundation.
Caution: you will need 2
people to assist you. Be
careful when laying floor
down not to bend or twist
it. When in place, level
floor completely.
Concrete Slab
Foundation
centered on
floor frame.
Note: The floor will be flipped over and
floor runners will sit on your foundation.
It is important to note that having a
level foundation is critical. Choosing a
foundation will vary between regions.
Typical foundations can be concrete
pads or patio stones positioned
underneath the floor runners.