Instructions / Assembly

22. Front Side Wall Panel will sit flush with floor framing at front end when positioned correctly.
Position side Double Window Wall on floor.
Front of Shed
Wall panel will
sit flush with
floor framing
at front of
shed.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 11
23. Position and secure Wall Panel studs together as per Step 16. Locate and position remaining
Double Window Walls on floor.
24. Position remaining Double Window Walls and attach as per Step 16. Place Fixed Window
Inserts in window openings as per Step 18.
Side