Steel Gazebo Assembl y Instruction OB-HTG001(DA007-2) We are forever grateful and appreciative of you considering purchasing our product. After careful evaluation of our product serie, we are excited to launch this product to the public as it is more technically advanced with lots of exciting and useful features. One of the great features added to the arsenal is its mere size, which will require 3-4 people with about 4-5 hours of installing time.
Steel Gazebo Assembly Instruction A 4 M4 4 C 4 M5 64 C1 4 M6 4 D 4 M7 1 E 4 O1 4 F 4 O2 4 F1 4 O3 4 G1 4 O4 4 G2 4 O5 4 G3 4 P 4 G4 4 Q 32 H 8 R 56 J1 4 R1 24 J2 4 S M6*47 8 K 1 T M6*25 56 K1 1 U M6*25 8 L 4 U1 M6*30 4 M1 4 V M6*15 108 M2 8 W M6*50 4 M3 4 X M6*10 32
Y Z2 5*10 56 Z1 4 1 1
step1 STEP 1: Attach Foot Base ( Part L) to the Pillars (Part A) A L V step2 C1 C C1 C F F F1 F1 A X A X You can put Part A down C1 C C C1 F F1 F A F1 Y F Y A Y F1 Y lf the screw hole is out of alignment, pull adjusting part C or C1 STEP 2: Attach Crossbeams 1 (Part C) and Crossbeams 4 (Part C1) to Pillars (Part A). Attach Support Brackets (Parts F and F1) to Crossbeam and Pillar. Attach Crossbeams 2 (Part C1) and Crossbeams 3 (Part C) to Pillars (Part A).
step3 STEP 3:Connect the Crossbeams C and C1 using Crossbeam Connector (Part P) Note: After sliding the Crossbeam Connector (Part P) into a crossbeam you should start one bolt to hold the Crossbeam Connector in place. UP C C1 P C1 C A A V step4 C C1 C1 P P C C C1 C1 C A A A A Step 4: Stand both sides Upright and Connect Crossbeams C and Crossbeams C1 using the Crossbeam Connectors (Part P).
step5-1 Y Y J1 STEP 5-1: Attach the Corner Protectors (Part J1) and the Rib Supports (Part J2) Just twist the top two screws of (Part J2) J1 C1 C C C1 step5-2 STEP 5-2: Slide 4 Netting Hooks (Part Q) into Crossbeams (Parts C and C1). Then Attach (Part M6) Note: There are two tracks.
step6 K1 E E E E E K1 E V V E E V STEP 6: Assemble the Roof Frame by Attaching the Roof Ribs Long (Part E) to the Roof Top Brace (Part K1).
step7 STEP 7: Lift the Partially assembled Roof on to the assembled Frame and attach. K1 E E V step8 D D D D D V V D D D STEP 8: Attach the Roof Ribs Short (Part D) to the Roof Top Brace (Part K1). Attached the Roof Ribs Short (Part D) to the assembled frame.
step9 STEP 9: Attach the Roof Supports 1 (Part H) to the roof frame using Connectors 1 (Part M3) and Connectors 2 (Part M4). V H H M3 M4 M3 E E M4 H Don't tighten all the screws, just hold the (Part H), until all of them are fixed H H D V H H H D D Please note that Parts M3 are installed on Parts D, and Parts M4 are on Parts E. H M3 H W Step 10: Attach the Clips (Part R1) and Clips (Part R) as shown in the diagram.
step11 Step11 - 1 :Install the Roof Plates (Part O5) on the Short Sides of the Gazebo. Tighten the screw (part U) halfwy,then install(Part G3), and finally tighten the (Part U) U If the screw hole is out of alignment, insert it with a screwdriver and correct it K O5 K1 M7 1 2 M2 G3 V V 4 3 G3 G3 Note: First fix 4 (Part M2) with V, but do not screw too tight, then install (Part G3) from left to right.
step12 S W M5 2 2 1 3 O1 1 2 4 3 T Step 12: Install the Roof Plates Part O1 O2 O3 O4 on the Gazebo. Start by sliding Roof Plate 1 (Part O2 and O3) into position. Then O1and O4. The same for the other three sides. M5 O2 O3 O4 T 3 U 4 step13 Note: First fix 4 (Part M2) with V, but do not screw too tight, then install (Part G1 and G2) from left to right. Attach the Center Rib Braces (Part M1) as shown in the diagram.
step14 Step 14: Fix 4 U1 (just screw in a little), then install G4 from left to right as shown U1 G4 G4 G4 G4 G4 G4 G4 G4 1 Gently insert Z2 from left to right as shown, Then Then tighten U1 and V Z2 G4 2 Z2 3 Z2
step15 STEP 15: Install the Mosquito Netting as Shown in the Diagram Q Z1 Z1 Z1 Z1 Z1