Installation Guide

Typical Installation
Laredo Sunset shown
double beam installation
requires connectors on
both sides of post
Installation Instructions,
56675 4” Post to Beam (P2B-LS-4)
51775 4” Post to Beam (P2B-IW-4)
updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information
Installation Instructions, 56675
V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is
1

Summary of content (9 pages)