Installation Guide

www.OZCOBuildingProducts.com
General Guidelines:
Materials are heavy and bulky minimum of 2 people are required for most installations
Brace and tie off large beams and posts until all connections are made
Wear proper safety equipment
Check with local authorities and home owners association before construction
Check for underground and or hidden utilities that could be damaged
Be sure to use the right tool for the job
Plan ahead and have the required hardware, fasteners and tools close at hand before starting the
installation
Steps:
1. Measure along beam and make vertical ½” long vertical marks from top edge of beam
2. Position the Rafter Clip so that the bend is ush with top of the beam and the point of the diamond
shaped cut out is centered on the marks
3. Remove threaded covers from all Hex Cap Nuts
a. Insert Lag Bolts into Cap Nuts
b. OWT Lag Bolts require a 3/8” Hex Bit
c. Replace Threaded Covers until ush with edge of the nut
d. HINT: Use tread lock on Threaded Covers in accessible areas
4. Install Lag Bolts into the beam
5. Repeat for all other rafter locations
6. Center the rafter on the beam and Rafter Clip
7. Install Lag Bolts into rafter
Pro Technique: If the installation requires the brackets to be mounted on both sides of the same
board be sure to inspect the brackets to orientate the holes so the attachment hardware does not
collide. NOTE: The fastener holes are offset on each bracket.
Use and Care: This hardware may not be suitable for every situation or installation application. A
design professional should be consulted to ensure the specic installation application meets local
building code requirements.
If hardware becomes dirty clean with soap and water. Avoid abrasions to surface and touch up any
scrapes with paint. Rinse with fresh water if hardware comes in contact with ice salt or salt water.
RafterClips4Item #: 56618
LaredoSunset-InstallationGuide