J952V Installation Manual
35
See Table 1 for 2” PVC pipe
lengths (field supplied)
Figure 31. Horizontal & Vertical Venting (B, C, & D Width Cabinets)
VERTICAL VENTING W/ 2-PIPES
(B, C, & D WIDTH CABINETS)
Support System on
Vertical Rise
First Support as Close
to Furnace as Possible
Couplings with 2
Hose Clamps (Optional)
HORIZONTAL VENTING W/ 2-PIPES
(B, C, & D WIDTH CABINETS)
FLUE PIPE
Coupling with 2 Hose
Clamps (Optional)
Straps or Other Suitable
Supports at minimum of 5 ft. Intervals
Upward Pitch - 1/4” per foot
(Flue Pipe)
First support placed as close
to furnace connection as possible
Wall
Normal
Snow Level
COMBUSTION AIR
90° Elbow
(both ends)
Seal/Caulk
Around Pipes
at Building
90°
Elbow
7”
12”
Min.
90°
Elbow
90° Elbow
Support System on
Vertical Rise
COMBUSTION AIR
FLUE PIPE
COMBUSTION AIR
1 2 3
4
5 67
8
1 2 3
4
5 6 7
8
1 2 3
4
5 6 7
8
PVC Te e
PVC Tr ap
FLUE PIPE
PVC Te e
PVC Tr ap
PVC Te e
PVC Tr ap
See Table 1 for 2” PVC pipe
lengths (field supplied)
See Table 1 for 2” PVC pipe
lengths (field supplied)