J952V Installation Manual
2
TABLE OF CONTENTS
IMPORTANT SAFETY INFORMATION .............................. 3
REQUIREMENTS & CODES ..............................................3
Combustion Air Quality ....................................................4
Heating Load ....................................................................5
Installation in a Garage ....................................................5
Clearances to Combustible Materials ..............................5
Operation of Furnace During Construction ......................5
COMBUSTION AIR & VENTING REQUIREMENTS ..........6
Direct Vent Systems ........................................................7
Conventional Vent Systems - Confined Spaces ..............7
Air From Inside .............................................................. 7
Outdoor Air from a Crawl Space or Vented Attic ........... 7
Outdoor Air Using Vertical Ducts ..................................8
Outdoor Air Using Horizontal Ducts ..............................8
Air Directly Through an Exterior Wall ............................8
Alternate Method of Providing Air from Outside: ...........8
Conventional Vent Systems - Unconfined Spaces ..........9
Category IV Venting ......................................................... 9
Vent Pipe Material ......................................................... 9
Vent Pipe Length & Diameter ........................................10
Vent Pipe Installation ....................................................10
Outdoor Terminations - Horizontal Venting ...................11
Outdoor Terminations - Vertical Venting .......................11
Vent Freezing Protection ...............................................11
Existing Installations ......................................................12
Condensate Disposal ....................................................... 12
CIRCULATING AIR REQUIREMENTS ............................... 12
Plenums & Air Ducts ........................................................12
Return Air Connections .................................................... 13
Upflow & Horizontal Furnaces ....................................... 13
Supply Air Connections ....................................................13
Acoustical Treatments .....................................................13
FURNACE INSTALLATION ................................................ 14
General Requirements ..................................................... 14
Upflow Furnaces ..............................................................14
Horizontal Furnaces ......................................................... 14
Inducer & Venting Options ...............................................15
Inducer Assembly Rotation ...........................................15
Pressure Switch Tubing ................................................15
Accessories ......................................................................16
Finish Flange .................................................................16
Rubber Grommets .........................................................16
PVC Components .........................................................16
Typical Orientation .................................................16
Alternate Orientation ..............................................17
Condensate Drain Lines ................................................17
Bottom Panel Removal ....................................................17
Alternate Bottom Panel Removal ..................................17
GAS SUPPLY & PIPING .....................................................18
Leak Check ......................................................................19
High Altitude Application (Natural Gas Only) ...................19
Converting from Natural Gas to LP / Propane .................20
ELECTRICAL WIRING .......................................................21
Line Voltage Wiring .......................................................... 21
Grounding ........................................................................22
Thermostat / Low Voltage Connections ...........................22
Single Stage AC & Single Stage Thermostat ................22
Single Stage AC & Two Stage Thermostat ...................22
Two-Stage AC & Two-Stage Thermostat ......................22
Autostaging for Single Stage Thermostats ......................23
Autostaging for Two-Stage Thermostats .........................23
Variable Speed Blower Application .................................. 23
Dehumidification Options .................................................23
Heat Anticipator ...............................................................23
START-UP & ADJUSTMENTS ...........................................23
Pre-Start Check List ......................................................... 23
Start-up Procedures ......................................................... 23
Verifying & Adjusting Input Rate ......................................24
Verifying & Adjusting Temperature Rise ..........................24
Verifying Burner Operation ..............................................25
Verifying Operation of the Supply Air Limit Switch ........... 25
OPERATING SEQUENCE ..................................................25
Heating Cycle ...................................................................25
Cooling Cycle ................................................................... 25
Fan Mode ......................................................................... 25
MAINTENANCE ..................................................................25
FIGURES & TABLES ..........................................................27
Figure 26. J952V*U Cabinet Dimensions ...................... 27
Gas Information ...............................................................28
Table 5. Gas Flow Rates ...............................................28
Table 6. Gas Pipe Capacities ........................................28
Table 7. High Altitude Deration - Propane Gas .............29
Table 8. Natural Gas Heating Values ............................29
Table 9. High Altitude Deration - Natural Gas with
HIGH Heating Value ........................................ 30
Table 10. High Altitude Deration - Natural Gas with
LOW Heating Value ......................................30
Electrical Information .......................................................31
Figure 27. Two-Stage Variable Speed Motor Control
Board ...........................................................31
Figure 28. Two-Stage Furnace Control Board ..............31
Figure 29. Wiring Diagram for Two-Stage, Variable
Speed Upflow Furnaces ............................... 32
Venting Information .......................................................... 33
Table 11. Vent Termination Clearances ........................ 33
Figure 30. Horizontal & Vertical Venting
(A Width Cabinets) .......................................34
Figure 31. Horizontal & Vertical Venting
(B, C, & D Width Cabinets) ..........................35
Figure 32. Upflow Venting Options (A Width Cabinets) 36
Figure 33. Upflow Venting Options
(B, C, & D Width Cabinets) ..........................37
Figure 34. Horizontal Venting Options
(A Width Cabinets) .......................................38
Figure 35. Horizontal Venting Options
(B, C, & D Width Cabinets) ..........................39
TROUBLESHOOTING ........................................................40
Table 12. Furnace Control Board Fault Conditions .......40
Table 13. Motor Control Board Fault Conditions ...........40
FURNACE COMPONENTS ................................................40
Figure 36. Component Locations ..................................41
INSTALLATION CHECKLIST ............................................. 44