J952V Installation Manual

37
UPFLOW - 1 PIPE OPTIONS
(B, C, & D WIDTH CABINETS ONLY)
Plug
Plug
Plug
VIEW -C-
Inline Drain Tube
(Factory Supplied)
See NOTE 4
VIEW -B-
Plug
OPTION 3
See VIEW B for drain line positions
Rubber
Grommet
PVC Te e
OPTION 4
See VIEW C for drain line positions
Rubber
Grommet
OPTION 5
See VIEW B for drain line positions
OPTION 6
See VIEW C for drain line positions
COMBUSTION
AIR
COMBUSTION
AIR
FLUE PIPE
COMBUSTION AIR
COMBUSTION AIR
PVC Tr ap
FLUE PIPE
Rubber
Grommet
FLUE PIPE
Rubber
Grommet
FLUE PIPE
PVC Te e
PVC Tr ap
PVC Te e
PVC Tr ap
PVC Te e
PVC Tr ap
Collector Box Drain
(Factory Equipped)
See NOTES 2 & 3
Field Supplied
Drain Line Attached
to PVC Tr ap
(Do Not Tr ap)
X
X
See
NOTE 3
See
NOTE 3
Collector Box Drain
(Factory Equipped)
See NOTE 2
Inline Drain
(Field Supplied)
See NOTES 2 & 3
X
See
NOTE 5
X
See
NOTE 5
UPFLOW - 2 PIPE OPTIONS
(B, C, & D WIDTH CABINETS ONLY)
Figure 33. Upflow Venting Options (B, C, & D Width Cabinets)
NOTES:
1. See Accessories section (page 15) for optional PVC Tee configurations and drainage options.
2. Drain tube must be trapped with a J-Trap or field supplied loop and drained externally from the cabinet. Traps may be positioned inside or outside the cabinet.
3. Inline drain is required only if “X” is greater than 6 feet.
4. Tubing needs to be cut to length and attached during unit installation.
5. Horizontal piping from inducer to flue pipe must be sloped 1/4” per foot to ensure drainage to PVC trap.