User Manual

November 1999
1-2 M68333 Rev. A Tel-Link PMP - Sector Terminal Installation & Maintenance Manual
Section 7: Sector Terminal Indoor Unit Equipment Physical
Installation - Provides instructions on how to
install the Indoor Unit.
Section 8: Sector Terminal Wiring and Cabling Installation -
Provides instructions on how to wire and cable
the Remote Terminal.
Section 9: Sector Terminal IDU Board Installation - Provides
instructions on how to install the boards making
up the Sector IDU.
Section 10: Sector Terminal Initial Power Application - Pro-
vides instructions on how to initially apply power
to the Remote Terminal.
Section 11: Initial Terminal Configuration and Testing - Pro-
vides instructions on how to configure and test the
Remote Terminal.
Section 12: Technical Support - Provides instructions on how
to contact the Technical Assistance Center.
1.2 FCC Requirements Summary
The Base Station/Sector Terminal complies with Federal Communications Commission (FCC) Parts 2 and
101 Regulations.
FCC ID for Base Station/Sector Terminal: L5X-PMP-01-000
Operators must be familiar with the requirements of the FCC Parts 2 and 101 Regulations prior to operating
any link using the equipment. For installations outside the United States, contact local authorities for appli-
cable regulations.
1.3 Requesting Changes
P-COM welcomes any suggestions for improving this manual. A Reader Comments Form is provided at the
end of this manual for recording comments and suggestions for improvement.