User Manual
November 1999
M68333 Rev. A Tel-Link PMP - Sector Terminal Installation & Maintenance Manual 5-3
STEP 2. After unpacking the equipment, visually inspect the equipment for damage and ensure
that:
• All components mounted on the individual boards are secure.
• The circuit boards are not cracked.
• There are no loose leads.
• The shelf unit has not been dented or damaged in any way.
STEP 3. Dispose of as much packing material as possible. P-COM suggests that the user retain
at least one of each box with all packing materials. In the unlikely event that it is neces-
sary to return a unit, the user will possess the required packing material for safe ship-
ment of the unit.
STEP 4. Make claims for any damages incurred during shipment to the transportation company
involved in accordance with company procedures.