User Manual

November 1999
M68333 Rev. A Tel-Link PMP - Sector Terminal Installation & Maintenance Manual 7-3
7.3 ODU Power Supply Chassis Rack Installation
7.3.1 Tools Required
Refer to Table 3-2 in Section 3.0 for applicable tools.
7.3.2 Materials Required
Four (4) cage nuts. (May not be required, consult rack manufacturer's documentation.)
Four (4) equipment mounting screws with washers. (Consult rack manufacturer's documenta-
tion for required size.)
7.3.3 ODU Power Supply Chassis Rack Installation Procedure
STEP 1. Install Cage nuts on the rack if necessary
STEP 2. Install the ODU Power Supply chassis using screws in the four mounting holes. The
ODU Power Supply chassis is typically mounted above the Basic IDU chassis.