User Manual

November 1999
M68333 Rev. A Tel-Link PMP - Sector Terminal Installation & Maintenance Manual 11-1
11.0 Initial Terminal Configuration and Testing
Proper functioning of this command and response exchange verifies that the IDU’s Local Site Manager
(LSM) agent and other critical software components are present and operational. Refer to the Tel-Link PMP
- Local Site Manager Users Manual No.M68331 for detailed information on LSM operations. From the PC,
the installer can use the Get and Set commands to communicate with the LSM agent in the IDU to program
and interrogate the IDU configuration. Completion of the configuration will ensure items are properly
loaded.
11.1 Terminal Configuration
STEP 1. After applying power to the IDU, allow the unit to warm up for five minutes.
STEP 2. Verify that each card has completed its self-test process and the LEDs on the front of
each card are in a operational state. (Refer to Table 11-1).
Table 11-1 - Board LED Indications
BOARD LED COLOR INDICATION DESCRIPTION
Modulator Green Blinking Operational
Off or Solid On Fault
Red Solid On Fault
Off Operational
Demodulator Green Blinking Operational
Off or Solid On Fault
Red Solid On Fault
Blinking Link Acquisition Mode
Off Operational
Sector ATM
Controller
Green Blinking Operational
Off Fault
Red Solid On Fault
Blinking Frequencies Incorrectly
Configured
Off Operational
ODU MUX Green Blinking Operational
Off or Solid On Fault
Red Solid On DC removed from ODU
Off Operational