User Manual

November 1999
11-4 M68333 Rev. A Tel-Link PMP - Sector Terminal Installation & Maintenance Manual
STEP 3. Turn on the Toggle Switch on the ODU Mux and verify the following LED state
occurred:
STEP 4. From the LSM initiate a software reset for the SAC by setting sac_Reset parameter to
Software_Reset and then right clicking on sac_Reset and selecting Set. Verify the fol-
lowing LED state changes occur. This action should not interrupt customer traffic:
STEP 5. From the LSM initiate a hardware reset for the SAC by setting sac_Reset parameter to
Hardware_Reset and then right clicking on sac_Reset and selecting Set. Verify the
following LED state changes occur. This action will interrupt customer traffic, causing
all Sector IDU boards to temporarily display red LEDs, then resuming their nominal
state. The system will recover within 60 seconds:
BOARD GREEN LEDs RED LEDs
Sector ATM Controller Blinking Off
Modulator Blinking Off
ODU Mux Blinking Off
Demodulator Blinking Off
BOARD GREEN LEDs RED LEDs
Sector ATM Controller Blinking Blinking first then Off
Modulator Blinking Off
ODU Mux Blinking Off
Demodulator Blinking Off
BOARD GREEN LEDs RED LEDs
Sector ATM Controller Blinking Blinking first then Off
Modulator Blinking Blinking first then Off
ODU Mux Blinking Blinking first then Off
Demodulator Blinking Blinking first then Off