Installation Manual Instruction Manual

ULTRA EDGE SEQUENTIAL SERVO ROLL FEED 6/3/2002
3
1 INSTALLATION
1.1 MECHANICAL INSTALLATION
The Ultra Edge Sequential Servo Roll Feed is supplied with an adjustable mounting bracket. The feed should be
securely mounted to the press frame. (A transition bracket is sometimes required in certain applications.) The feed
should be centered, square, and perpendicular to the pass line of the press. It should be mounted at a height that will
accommodate the appropriate die sets. The feed has a pass line height adjustment of ±1.2 inches. (Note: The
centerline of the Feeder is NOT the centerline of the rolls.) Refer to FIGURE 1 for dimensions.
The feeder may be used to push or pull strip stock through the die.
If pilot locating pins are used in your die sets, the optional mechanical roll release bracket should be attached to the
press ram. It must be mounted in such a way as to provide roll release at the proper time and be adjustable for
different die sets.
If the optional electro-pneumatic piloting is used, another cam switch will be necessary for controlling feed roll
opening and closing.
FIGURE 1