Use and Care Manual
IMPORTANT
Please read these instructions carefully before you start to assemble this
greenhouse.
Please carry out the steps in the order set out in these instructions.
Keep these instructions in a safe place for future reference.
» Safety Advice
We strongly recommend the use of work gloves during assembly . Do not
attempt to assemble the greenhouse in windy or wet conditions.
Do not touch overhead power cables with the aluminum profiles. Always wear
shoes and safety goggles when working with extruded aluminum. Dispose of
all plastic bags safely - keep them out of reach of small children. The greenhouse
must be positioned and fixed on a flat level surface. Do not lean against or push
the greenhouse during construction. Keep children away from the assembly
area. Do not position your greenhouse in an area exposed to excessive wind.
Do not attempt to assemble this greenhouse if you are tired, have taken drugs
or alcohol or if you are prone to dizzy spells. If using a step ladder or power
tools ensure that you follow the manufacturers safety advice. Hot items such as
recently used grills, blowtorches, should kept away from the greenhouse walls.
We recommend the greenhouse is bolted to a concrete base or slabs (fix hinges
are not supplied). However, if you want to fix directly in to the concrete ensure
there are no hidden pipes or cables in the ground before inserting the pegs.
» Care & Maintenance
When your greenhouse needs to be cleaned, use a mild detergent solution and
rinse with cold clean water. DO NOT use acetone, abrasive cleaners or other
special detergents to clean the clear panels.
For replacement parts - call our service line.
For additional information please visit our web site:
www.palramapplications.com
Tools & Equipment
Tape measure
Work gloves
Plastic or rubber mallet
Phillipshead screwdriver
Step ladder
Scissors
Spirit level - For base alignment
Cloth
» General Advice
This multi-part assembly is best achieved by two people. Allow at least half a day for the assembly
process.
Site selection instruction-choose a sunny level position away from overhanging trees. If you are fixing
your greenhouse directly to a solid concrete foundation use the pre drilled holes in the metal base
supplied.The component parts should be checked and laid out close at hand. Keep all small parts
(screws etc.) in a bowl so they do not get lost.
Sort the parts and check against the contents parts list.
Carry out the assembly steps in the order set out in the instructions.
The front of the greenhouse is the wall including the door, and the back is the opposite wall.
After assembly fit the greenhouse to the base using connectors no. 924 and fit
the whole unit to a leveled final
You may use Silicon lubricant spray in order to help you slide the profiles on the
connectors. Do not spray the Polycarbonate panels. Use the rubber malet if necessary.
Notes (by steps)
Step 3: Profile 821 should be placed on the left hand
side to be connected to profile 822.
Profile 821 is the one with the connector at the end.
Step 4: After connecting profiles 816 to each other
clean the connection area using a cloth. Place the
cover strip on the conection only when it is clean and
dry. press the cover strip from one side of the connec-
tion to the other as mentioned in picture 4.
Step 7: Profile 800 & 801 should be aligned and con-
nected according to the illustration on page 7 a & b.
plug 23 should be inserted to each connection while
the two dots on the front of the plug should be in
horizontal position for easy assembly.
Step 9: Use part 95 as a template in order to measure
the gap between posts 800 & 801 of the greenhouse
wall and roof area.
Step 10: Profile 806 should be placed on the right
hand side. Profile 805 should be placed on the left hand
side when viewed from the front.
Step 11: Slide the panel 7011 till the end of the rail
and insert it into it's final position as shown in illustar-
tion c .
Step 12: Profile 808 should be placed on the right.
Profile 803 + 807 should be placed on the left.
Profile 804 should be placed on the right.
Step 15: Be careful to assemble the window in the
position as shown on picture 16 a. profile 809 should
be placed while the vent is closed to cover any gap.
Ensure profile 809 is fitted correctly as shown on
picture 16 b. The lip on 809 should face toward the
gutter.
Step 18: Slide the panel 7011 till the end of the rail and
insert it into it's final position as shown in illustartion a
and b.
Step 19: Step inside the greenhouse and turn all 23
plugs a 1/4 of a turn clockwise.
Step 20: Profiles 814 should be inserted from the four
corners of the greenhouse, then insert profile 815 in
between them.
Step 22: Ensure you use long screw 450 to secure the
door catch 43 as shown in illustration b.
Step 24: Bend the tab lock from the inside after
bending the base parts, then lock it using screw 447.
Step 27: You should tighten screw 97 when profiles 807
& 808 are aligned and connected.
Steps 25,40: Anchor the greenhouse, use suitable
screws and plugs. (Screws and plugs are not supplied).
!
Important Recommendations
Firmly connect the greenhouse to a level
surface immediately after completion of the
assembly.
Anchoring this product to the ground is
essential to its stability and rigidity.
It is required to complete this stage in order for
your warranty to be valid.
Tighten all screws once assembly is completed.










