Use and Care Manual

IMPORTANT
Please read these instructions carefully before you start to assemble this greenhouse.
Please carry out the steps in the order set out in these instructions.
Keep these instructions in a safe place for future reference.
a Safety Advice
We strongly recommend the use of work gloves during assembly . Do not attempt to
assemble the greenhouse in windy or wet conditions.
Do not touch overhead power cables with the aluminum profiles. Always wear shoes and
safety goggles when working with extruded aluminum. Dispose of all plastic bags safely -
keep them out of reach of small children. The greenhouse must be positioned and fixed on
a flat level surface. Do not lean against or push the greenhouse during construction. Keep
children away from the assembly area. Do not position your greenhouse in an area exposed
to excessive wind.
Do not attempt to assemble this greenhouse if you are tired, have taken drugs or alcohol or
if you are prone to dizzy spells. If using a step ladder or power tools ensure that you follow
the manufacturers safety advice. Hot items such as recently used grills, blowtorches,
should kept away from the greenhouse walls.
We recommend the greenhouse is bolted to a concrete base or slabs (fix hinges are not
supplied). However, if you want to fix directly in to the concrete ensure there are no hidden
pipes or cables in the ground before inserting the pegs.
a General Advice
This multi-part assembly is best achived by two people. Allow at least half a day for
assembly process.
Site selection instruction-choose a sunny level position away from overhanging trees. If
you are fixing your greenhouse directly to a solid concrete foundation use the pre drilled
holes in the metal base supplied. The component parts should be checked and laid out
close at hand. Keep all small parts (screws etc.) in a bowl so they do not get lost.
a Care & Maintenance
When your greenhouse needs to be cleaned, use a mild detergent solution and rinse
with cold clean water. DO NOT use acetone, abrasive cleaners or other special detergents
to clean the clear panels.
For replacement parts - call our service line.
For additional information please visit our web site: www.palramapplications.com
a Care & Maintenance
l Tape measure
l Work gloves
l Plastic or rubber mallet
l Phillipshead screwdriver
Step 12: Slide the panel 550 till the end of
the rail and insert it into it’s final position as
shown in illustartion c .
Step 16: Be careful to assemble the
window in the position as shown on
picture 16 a. profile 809 should be placed
while the vent is closed to cover any gap.
Ensure profile 809 is fitted correctly as
shown on picture 16 b. The lip on 809
should face toward the gutter.
Step 19: Slide the panel 550 till the end of
the rail and insert it into it’s final position as
shown in illustartion a and b.
Step 20: Step inside the greenhouse and
turn all 23 plugs a 1/4 of a turn clockwise.
Step 21: Profiles 814 should be inserted
from the four corners of the greenhouse,
then insert profile 815 in between them.
Step 23: Ensure you use long screw 450
to secure the door catch 43 as shown in
illustration b.
EN
a Notes (by steps)
Step 3: Profile 821 should be placed on the
left hand side to be connected to profile 822.
Profile 821 is the one with the connector at
the end.
Step 4: After connecting profiles 816 to each
other clean the connection area using a cloth.
Place the cover strip on the conection only
when it is clean and dry. press the cover strip
from one side of the connection to the other
as mentioned in picture 4.
Step 5: Profile 800 & 801 should be aligned
and connected according to the illustration
on page 7 a & b. plug 23 should be inserted
to each connection while the two dots on the
front of the plug should be in horizontal posi-
tion for easy assembly.
Step 9: Use part 95 as a template in order to
measure the gap between posts 800 & 801
of the greenhouse wall and roof area.
Step 11: Profile 806 should be placed on the
right hand side. Profile 805 should be placed on
the left hand side when viewed from the front.
l Step ladder
l Scissors
l Spirit level - For base alignment
l Cloth
l Sort the parts and check against the contents parts list.
l Carry out the assembly steps in the order set out in the instructions.
l The front of the greenhouse is the wall including the door, and the back is the opposite wall.
l After assembly fit the greenhouse to the base using connectors no. 35 and fit the
whole unit to a leveled final
l You may use Silicon lubricant spray in order to help you slide the profiles on the
connectors. Do not spray the Polycarbonate panels. Use the rubber malet if
necessary. Avoid shaking the plastic connectors.