Installation Guide

During Assembly
an.
When encountering the information icon, please refer to the relevant
assembly step for additional comments and assistance.
This icon indicates
that the installer should
be inside the product.
Attention
This icon indicates that the
installer should be outside the
product.
During assembly use a soft surface below the parts to avoid scratches and damages.
Step 1: If you've purchased a WPC Floor Kit, do not assemble profile #8851!
Step 8: If you're installing a WPC Floor Kit, measure and cut floor board # 8912.
Step 18: Matte side of all product's panels should be facing out!
Use mild soap if needed to ease sliding of profiles & panels.
Step 22: It is recommended to insert screws #411 as preparation for mounting shelves. If you've
purchased a shelf kit, mount a maximum of 2 shelves per post.
Step 26: Note the bracket's direction as shown in the drawings, make sure the bracket is in line
with the gutter profile.
Step 27: Note the bracket's direction and make sure the screws are positioned inside the profile's
channels as shown in the drawings.
Step 28: It is recommended to insert screws #411 as preparation for mounting shelves. If you've
purchased a shelf kit, mount a maximum of 2 shelves per post.
Step 32: If you've purchased the Yukon 11x21.3 Storage Shed, please continue building the walls,
adding the additional bracket and inserting screws #411 as preparation for mounting shelves, as
you've done in the last 4 steps.
Step 33: It is recommended to insert screws #411 as preparation for mounting shelves. If you've
purchased a shelf kit, mount a maximum of 2 shelves per post.
Step 41: Before inserting the screws, make sure the internal metal profiles are not protruding and
are well connected with one another inside the aluminum profiles.
Step 44:The sticker must be placed on a clean and dry surface.
Step 53: Slow down and be careful when sliding the panels in.
Step 56: Make sure the distance between the wall's aluminum profiles and gutter is identical prior
to tightening the screws on the inside.
Step 73: Make sure the shed is leveled prior to anchoring it to the surface of your choosing. Use
suitable screws and plugs (not supplied).
*Tighten all screws when completing assembly.
Do not tighten screws and nuts (411 & 466) until completion of assembly process.
These 2 icons indicate if screws' tightening is required or not.
A
Note: Anchoring this product to the ground is essential to its stability and rigidity.
It is required to complete this stage in order for your warranty to be valid.