Installation manual

9
4. LonWorks Interface Test Run
Before performing a test run of the LonWorks Interface,
perform test runs of the A/C units and assign central control
addresses for A/C units.
[LonWorks Interface Test Run Procedure]
(1) Press and hold touch-switch S001 on the main circuit board
for 5 seconds or longer.
Test run mode is enabled for the main circuit board that is
currently being controlled. LD001 illuminates, and LD002 –
LD008 turn off.
(2) Press touch-switch S002. The data LEDs appear as shown
in the tables below.
In addition, the assigned indoor unit groups start and stop
as shown in the tables below.
(3) Be sure to reset the power after the LonWorks Interface test
run is completed.
1
2
Data
3 4 5 6 7 8
LD
COM
1
2
Data
3
4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
Stop
Stop
Stop
Stop
STEP 1
S002 PUSH
1
2
Data
3
4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
Start
Stop
Stop
Stop
STEP 2
1
2
Data
3
4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
Start
Start
Stop
Stop
STEP 3
1
2
Data
3
4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
Start
Start
Start
Stop
STEP 4
S002 PUSH
S002 PUSH
S002 PUSH
COM
COM
COM
COM
S002 PUSH
S002 PUSH
1
2
Data
3
4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
Start
Start
Start
Start
STEP 5
1
2
Data
3
4 5 6 7 8
Indoor unit Gr
0
1
2
3
Start/stop
STEP 1
COM
COM
Stop
Stop
Stop
Stop
Pana_CZ-CLNC1U_Eng.indd 9Pana_CZ-CLNC1U_Eng.indd 9 2011/11/11 12:23:432011/11/11 12:23:43