Installation Manual

For Technical Support: www.panduit.com/resources/install_maintain.asp
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2015
FS006D
Page 7 of 11
Tak-Ty cables to
fence as needed.
Drawer in home position
Figure 8C
Drawer in extended position.
Free floating
Tak-Ty
Grommet
Fixed Tak-Ty
Individual
fiber breakout
point.
(See detail at
right)
Route fiber through grommet as shown. Use
enough cable length to ensure one complete
loop (approx. 52" [1.32m]) of individual fibers
around slack spools. Leave enough jacketed
slack so when the drawer is fully extended the
cables are not put under tension. DO NOT use
so much slack that the drawer cannot be
returned to its home position (See Figure 8C).
Use Tak-Tys to secure fiber cords at cable entry
location and other points as shown.
Adhesive
mount with
Tak-Ty
Cable Jacket
Individual Fiber
Fiber Breakout Detail
Be sure adhesive mount secures
jacketed trunk cable. DO NOT clip
individual 900µm buffered fibers.
Sub-unit
tubes
1.0"
“A”
“B”
Cable length
between point “A”
and point “B” is
approx. 36"
[.914m].
[25.4m]
Figure 8B
Note: Cover not shown for clarity.
Note: Cover not shown for clarity.