Installation Manual

For Technical Support: www.panduit.com/resources/install_maintain.asp
INSTRUCTIONS V00028FG REV 12
Page 3 of 4
Flippable EIA Mounting Rails
The rack is shipped with rails in a numbers-up orientation. The rails can
be flipped to read in a numbers-down orientation by moving 1 right rail and
1 left rail in tandem. Remove (3) 5/16"-18 X 3/4" Mounting Bolts on each
rail. Then flip right rail so that numbering reads down and bolt to left side
of assembly using bolt orientation shown. Then flip left rail so that num-
bering reads down and bolt to right side of assembly using bolt orienta-
tion shown.
Numbering-Up
Orientation
Numbering-Down
Orientation
Use J-Bolt mounting holes for
securing ladder rack to the 4-post
rack.
CVPPB- Zero RU Bracket- to mount 1RU
EIA 19" copper and fiber patch panels to
the side of rack posts.
CVPPB
Secure to desired hole location
using #12-24 screws
Side of post installation
J-Bolts up to 3/8" in diameter may
also be installed directly to the top
angle without interference with the
top mounting RU space.
RSHLF- Shelf for 30" Deep rack
RSHLF23- Shelf for 23" Deep rack
RSHLF36- Shelf for 36" Deep rack
Note: Shelf load rating is 275 lbs. when rails are
spaced a minimum of half the shelf depth.
Mount bracket to
desired RU in rear of
rack
#12-24 screws
Shelf
Slide shelf into slots in rear mounting bracket
Secure with (4) #12-24 screws
Note: Shelf is designed to support large net-
working equipment in combination with sup-
plied equipment mounting flanges.
PR2VWF/PE2VWF
1. Align waterfall slots around the backbone
part of the manager as shown.
2. Align holes in waterfall with holes in rack.
3. Fasten components together using
(2) M6 x 12mm screws &
(2) M6 serrated nuts.