Installation Manual
INSTRUCTIONS V00028FG REV 12
For instuctions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
E-mail:
techsupport@panduit.com
Fax:
(866)405-6654
www.panduit.com
Page 4 of 4
Large equipment installation- Install mounting cradle (included
with equipment.) See Best Practices below.
Large equipment installation- Install equipment. When install-
ing securing hardware, install bottom, top, middle screws and
tighten before installing remaining screws. See Best Practices
below.
mounting cradle
Equipment
Top
Middle
Bottom
LARGE EQUIPMENT INSTALLATION BEST PRACTICES
Install the equipment at the lowest possible RU on the rack for stability. If there are other devices in the rack,
install the heaviest chassis below the lighter chassis.
Refer to equipment installation documents for specific installation requirements.
Only trained and qualified personnel should be allowed to install, replace, or service equipment.
CVPDUB- Pair of Brackets for Vertical POU Button Mounting to the
side of the rack post.
CVPDUB
Align bracket to desired location
on rack post, then secure with #12-24 screws.
#12-24 screws




