Installation Manual

© Panduit Corp. 201
5
INSTALLATION INSTRUCTIONS
HEAT TRACE
WITH ST2MT & ST4MT
Page: 2 of 2
4. Once positioned in place, wrap HTMLT tie around pipe and heat
trace every 12 inches. Feed the tail into the head of the wave ty
and manual position and tighten. Do not position head of tie over
the heat trace.
5. Use recommended tool for Heat Trace application (either RT2HT, ST2MT or
ST4MT). Once HTMLT tie is
positioned and hand tightened around pipe and heat trace, begin feeding tail through side entry head of tool.
6. Once tail is positioned through head of tool, begin squeezing handle
to begin tightening HTMLT tie. As you tighten Heat Trace Wave Ty,
you should begin to notice that heat trace is getting pulled in contact
with the pipe. Repeat squeezing motion with handle until heat trace
is tight and secure against pipe.
7. Do not over tighten HTMLT ties. As tie begins to tighten around pipe, you may begin to notice that wave begins
to flatten out. Be sure to stop tightening tie prior to wave becoming flat.
8. Once heat trace is in contact with pipe and is tight and secure, move
cutting handle upward to engage cutting action on the ST4MT and
remove excess material. For the ST2MT keep tool engaged and
twist counter clockwise (turn to the right) to cut off excess material.
9. Repeat every 12 inches until heat trace is completely attached along the entire length of the pipe.
www.panduit.com
U.S.A. Email:
techsupport@panduit.com
U.S.A. Technical Support:
Tel: 1-800-777-3300
EU Website: www.panduit.com/emea
Email: emeatoolservicecenter@panduit.com
Panduit Europe • EMEA Service Center
Tel: +31-546-580-452 • Fax: +31-546-580-441
Latin America Website: www.panduit.com
Email::cs-la@panduit.com
Latin America:
Tel: 52 (333) 666-2501 • Fax: 52 (333) 666-2510
Asia/Pacific Email: cs-ap@panduit.com
Asia/Pacific:
Tel: 65 6379 6700 • Fax: 65 6379 6759