Introduction Thank you for purchasing the Gazebo GZ584E. When properly assembled and maintained, this gazebo will provide many years of enjoyment! These instructions include helpful hints and important information needed to safely assemble and properly maintain the gazebo. Please read these instructions completely before you begin. Our patented gazebo has been designed for Al steps can be completed by a team of two people. The assembly should take about two hours.
Safety Advice The gazebo must be positioned and fixed on a flat level surface. * Dispose of all plastic bags safely. Keep them out of the reach of children. * Keep children and pets away from the assembly area until the work is completed. * Always wear shoes, gloves and safety goggles when working. * Take special care not to ouch overhead power lines with the aluminum profiles. * Do not attempt to assemble the gazebo in windy or wet conditions.
List of Parts The gazebo is shipped in three cartons. These cartons are heavy. Be careful when luffing them. fear proper safely gear inclusiveness shoes, gloves and goggles. The parts are identified by removable stickers. Place all the parts for each step in slagging areas, checking that you have all pairs as you go. f any parts are missing or damaged, contact customer service before beginning assembly: Customer 782 4482 9. motile ty | Step| | No.
No. Profile No. Profile Gty | Step 127 Roof gable connector 240mm M8x70mm Fabric canopy fop 8|27 Fabric canopy Roof connector Screw ! Se raw Méx15mm M4x25mm Plastic Cap 23 — 8 56|32 25 Craw ©)J @ ® M6x33mm Plastic Cap We included some extra screws and bolts for your convenience.
STEP 1 Assembling the Corner Profiles Place all the parts on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. Place corner profiles (1) parallel to each other on the ground. Slide support plates (14) info corner profiles from the end with a single screw hole, as shown.
STEP 2 Assembling the Roof Profiles A~ Place all the pairs on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly fo ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. [Components | Insert end of long roof profile lino long roof profile {3} as shown. Fasten with screws (21). Roof profile (2) Roo profile (3] Repeat fo make fwo chefs.
et STEP 3 Attaching Roof Profiles to Corner Profiles Attach long roof profile chefs (2,3) to corner profiles (1) as shown. Fasten with bolts (22). Repeat fo make two chefs. as shown. Fasten with bolts (22).
STEP 4 Attaching the Roof Connectors ¥ to Roof and Corner Profiles L Attach roof connectors (16) to corner profile & covers (1 5) with bolts {21) fasten as shown. Attach roof connectors (16) and (27) to roof “ profiles (2) and (4) with boils (21) fasten as shown. Rmmmnedoy(w) Roof Coronado 27 Screwball) WEH IMPORTANT : After this step you should place the gazebo frame in its desired location. Make sure all corners are squared ot 90 degrees.
their underside. The end with the protrusions is connected fo the fop gable connector {13). The roof gable extension {11} has a small protrusion underneath which wil snap into one of the holes in roof gable extension (9) while refreshing the canopy.
Connect one roof gable profiles assembly (6,12) and one roof gable profiles assembly {6,11) opposite each other to top gable connector {13} until the small protrusion on their undersides snap into the holes on the underside of top gable connector (13). ATTENTION: The tunnels of top gable connector {13) are marked, in order fo avoid mistakes when inserting the roof gable profiles.
Using at least two people, slide the other two roof gable assemblies (6,12 6,11) info tunnels of top gable connector (13) until the small protrusion on their undersides snap into the holes on the underside of top gable connector {13). ATTENTION: The runnels ot fop gable connector {13) are marked, in order to avoid mistakes when inserting the roof gable profiles.
Connect the two roof gable profiles {6,12) and (6,11,9) fo roof connectors {16) on opposite comer profiles (1). Fasten with screws (23) as shown. Slide roof gable extension (9) over roof gable extension (11) until the small protrusion on it's underside snaps into the third hole on the underside of roof gable extension (9). NOTE: You will need fo extend profile {9) outwards to stretch the roof canopy info ifs final position.
STEP 6 Attaching the Center Roof Gables IMPORTANT: The roof gable profiles (7,8) have small profusions (spring bunions) underneath. The end with the protrusions is connected to the top gable connector (13). Insert Plastic Cap {31) info Roof gable profile (7,8) as shown. [Permanents | Insert ends with push bunions of roof gable profiles {7) on short side of the gazebo into marked tunnels of fop roof connector (13) as shown, until they snap into Roof gable Roof gable profiteer) profile{8) place.
STEP 8 Placing the Canopy 'WARNING: When inserting the roof profiles info the fabric pockets of the canape, you MUST use both hands holding the large piece of roof fabric in order fo stretch it. Don’t iry 1o stretch it and pull it just by pulling the pockets| It will tear the pockets as Umbrella fabric is not elastic by nature, Place the upper fabric canopy (18) carefully over the higher part of roof gable profiles (6), stretch and slide Scleroses into fabric pockets.
Using at least two people, place the large canopy {19) carefully over the small canopy (18) and three roof gable profiles (6+12) as shown. Stretch the canopy and slide profiles into fabric pockets in large canopy rim (19). Use TWO hands fo pull the fabric backward until the roof refiles slide firmly into the pockets. Do NOT try fo stretch and pull the roof fabric by pulling the pocket only. This will fear the pocket, as Umbrella fabric is not elastic by nature.
Optional Securing the Gazebo fo a Concrete Floor or Wood Deck Concrete Floor: ) 1. Using an electric concrete drill, drill holes into the concrete floor, Imposing corresponding to the holes in the support plates. 0:=) ] @@ 2. Insert concrete bolts {25} into the holes and hammer info place, using a mallet. | conceits bots, washers and s (25) 3. Fasten concrete bolts with washers and nuts. x S Wood Deck: 1.
Gazebo GZ584E Assembly Instructions WARRANTY: Warranty covers damage due to manufacturing defects only for a period of 5 years on the structure and 2 years on the Polyester roof/canopy from date of purchase. Warranty does not cover weather inflicted damage and/or damages causes caused by not following assembly instructions and adhering to warnings in manual. Warranty does not cover user error, negligence, or misuse. /> WARNING: Cancer and Reproductive Harmwww.P65Warnings.ca.gov.