introduction Thank you for purchasing the Gazebo GZ584. When properly assembled and maintained, this gazebo will provide many years of enjoyment! These instructions include helpful hints and important information needed to safely assemble and properly maintain the gazebo. Please read these instructions completely before you begin. Our patented gazebo has been designed for easy assembly. Al steps can be completed by a team of two people. The assembly should take about two hours.
Safety Advice » The gazebo must be positioned and fixed on a flat level surface. * Dispose of all plastic bags safely. Keep them out of the reach of children. * Keep children and pets away from the assembly area until the work is completed. « Always wear shoes, gloves and safety goggles when working. + Take special care not fo touch overhead power lines with the aluminum profiles. * Do not attempt to assemble the gazebo in windy or wet conditions.
List of Parts The gazebo is shipped in three cartons These cartons are heavy Be careful when lifting them. N Wear proper safety gear including work shoes, gloves and goggles. The parts are identified by removable stickers. Place all the pairs for each step in staging areas, checking that you have all parts as you go. If any pairs are missing or damaged, contact customer service before beginning assembly: Customer 782 4482 J No. Profile Oly sleep | No.
STEP 1 Assembling the Comer Profiles Place all the parts on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly fo ensure an easy installation. Wear proper safely gear including work shoes, gloves and goggles. Place comer profiles(1) parallel fo each other on the ground. Slide support plates(14) into corner profiles from the end with a single screw hole, as shown.
STEP 2 Assembling the Roof Profiles Peace all the parts on a level surface. Make sure the pieces are in the comet positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. Insert end of long roof into long roof profiterole Fasten with screws(21). profiterole) s shown. @ Roof profile () ~<=J Roof profile 3} Repeat fo make two sets.
Attach \onfi roof profile to comer profiles(1) as shown. Fasten wit Repeat to make two chefs. Gaia Attach short roof profile to corner profiles(1) as shown.
STEP 4 Attaching the Roof Connectors to Roof and Corner Profiles Attach roof connector) to comer profile covers(15) and roof profiles(2) and (4) as shown. [ Comoran | Insert Plastic info canopy support{29) as shown, Bolt (21) Fasten with bolts{21). Snoopy Speedster 10 POI OZ] ool Fasten with bolts(21). x4 x4 ) ® Plastic Cup(32) @ Plastic Cup(33) Bl i BB mEy Make sure oll corners are squared ot 90 degrees. IMPORTANT: After this step you should place the gazebo frame in its desired location.
STEP 5 Attaching the Corner Roof Gables IMPORTANT: The roof gable extension{11} has a small protrusion underneath which will snap info one of the holes in roof gable extension{9) while stretching the canopy. Components Top gable i m::sdfleag) Roof gable extension {12}~ Shareware) Plastic Cap(31) Roof gable extension Screw{28) Bolt (21) Plastic Cap(32) x1 commemorator) Roof gable profiterole) {68} (6C) Roof gable extension{11) Roof gable connector(17) Boll) \fi_fl@ Assemble Roof Gable profile(6) with one 6A, on
s Connect one roof gable profiles and one roof gable profiles opposite each other to fop gable by screw(28) as shown. ATTENTION: The tunnies of top gable connectable, 13B) are market, in order fo avoid mistakes when insert ing the roof bugle profiles. Using ot least two {:people, connect roof gable profile assembly(13A,13B,6,12,11) fo roof connectors{16) on opposite comer profiles(1). Fasten with bolts(23) as shown.
Using at least two people, slide the other two roof gable 6,11) info tunnels of top gable with screw(28). ATTENTION: The tunnels of fop Eagle interconnection) marked, in order 1o avoid mistakes when inserting the roof roof gable profiles.
Connect the two roof gable and {6,11) fo roof connector) on opposite corner s{23) as shown. Fasten with bo Insert Plastic cap(32} info roof gable extension(9) as shown. Slide roof gable extension(9) over roof gable extension(11) until the small protrusion on it's underside snaps info the third hole on the underside of root gable extension(9). NOTE: You will need to extend profile(9) outwards to stretch the roof canopy into its final position.
STEP 6 Attaching the Center Roof Gables IMPORTANT: The roof gable have small professionalizing bunions) underneath. The end with ge profusions is connected 1o the gable Insert Plastic cap{31) info roof gable os Components | shown. Roof gable Insert roof gable profiles{7) on short side of the gazebo | gab profile (8) (Dmma)® into marker tunnels of top roof profile (7) x2 4 fasten with screw{28) as shown.
STEP 8 Placing the Canopy WARNING : When inserting the tool profiles lino the fabric pockets of the canopy, you MUST use both hands holding the large piece of roof fabric in order to stretch it. Don't fry to stretch it and pull it just by pulling the pockets! It will lair the pockets as Umbrella fabric is nol elastic by nature, Place the upper fabric canopy(18) carefully over higher part of gable Profitless, stretch and slide profiles into pockets.
Using at least two people, place the \are 9} carefully over the small campanology ) and three roof gable as shown. retch the canopy and slide profiles into fabric pockets in large canopy rim(19). Use TWO hands to pull the fabric backward until the roof profiles slide firmly into the pockets. Do NOT iry fo stretch and pull the roof fabric by pulling the pocket only This will tear the poacher, as Umbrella fabric is not elastic by nature.
Optional Securing the Gazebo fo a Concrete Floor or Wood Deck Concrete Floor: 1. Using an electric concrete drill, drill holes into the concrete floor, corresponding fo the holes in the support plates. 2. Insert concrete abolish) info the holes and hammer info place, using a mallet. 3.Fasten concrete bolts with washers and nuts. Components o=m 90 Concrete bolts, washers and nuts (28) x12 Wood Deck: 1.
Gazebo GZ584 Assembly Instructions WARNING: Cancer and Reproductive Harmwww.P65Warnings.ca.gov. /\ ADVERTISEMENT: Cancer et Troubles de I apparel reproducteurwww.P65Warnings.ca.gov. /i\ INADVERTENCE: Cancer y Dario Reproductivowww.P65Warnings.ca.gov. WARRANTY: Warranty covers damage due to manufacturing defects only for a period of 5 years on the structure, 5 years on the UMBRELLA roof/canopy and/or 2 years on the Polyester roof/canopy from date of purchase.