Product Info
Table Of Contents
- Foreword
- 1 Overview
- 2 Description
- 3 Installation
- 4 Operation
- 5 Maintenance
- 6 Connector information
- 7 Specification
- 8 Associated equipment
- Index
- Annex
T6-D-USER-TRV-EN Page 4-8 Operation
© Park Air Systems Ltd 2016
4.3 How to guides
4.3.1 How to do a BIT test from the front panel
Test is shown in the status list:
Select
Scroll so that Status is shown.
To enter the status list:
Push
The status list screen is shown:
Scroll so that Test is shown:
Push to start the BIT test
The screen shows:
The Status indicator illuminates:
Status
Settings
Test
FULL SERVICE
No Messages
Test
FULL SERVICE
Initiating BIT