Operation Manual
PDBNP 14 A1
■ 42
│
GB
│
IE
♦ After installing the metal cone (E), check the distance between the
thread and metal cone (E). It should be approximately 70 mm. You
can use the assembly spanner
as a measuring aid. If necessary,
adapt the measurement by adjusting the lock nut (B).
approx. 70 mm
B E
♦ To attach the front connector , press it onto the thread (you will
feel minor resistance) and tighten it by hand.
♦ Tighten the front connector
using the assembly spanner .